News
![](https://www.transportesmontejo.com/wp-content/uploads/heliconias-1-300x225.jpg)
Heliconias Project
The transportation of 7 transformers from San Jerónimo Antioquia to Heliconias was executed. Main difficulties: The access road to the project is an extremely narrow
![](https://www.transportesmontejo.com/wp-content/uploads/eslingas-para-gruas-300x225.jpg)
Rigging for Crane Operations
Types of slings to consider for upcoming projects In addition to hiring a certified and experienced crane company, you should keep in mind that they
![](https://www.transportesmontejo.com/wp-content/uploads/boeing-707-1-300x225.jpg)
Boeing 707
In 2018 a challenging service was obtained by the Colombian Air Force to mobilize one of the most important aircraft, the Boeing 707 (Also called
![](https://www.transportesmontejo.com/wp-content/uploads/domo-caldera-300x225.jpg)
Steam Boiler Dome
This dome was transported from Cartagena to Cali for the client Incauca. Main difficulties: Road “la línea” between Ibague and Calarcá, due to the curves.
![](https://www.transportesmontejo.com/wp-content/uploads/pala-minera-1-300x225.jpg)
Mining Sholves
Several mining shovels have been transported throughout this year 2020 and previous years. This machinery is equipment that is not designed to move 40 kilometers
![](https://www.transportesmontejo.com/wp-content/uploads/gruas-izaje-300x225.jpg)
Barrancabermeja Reactor
A reactor was transported and installed for the ecopetrol plant in Barrancabermeja. Transportes Montejo moved the new reactor to the plant, unloaded the old one,
![](https://www.transportesmontejo.com/wp-content/uploads/barbados-1-300x225.jpg)
Barbados
Project carried out in mid 2020, one month of continuous operation for which personnel (7 people) and equipment were mobilized from Colombia. The objective of