We conducted the largest multimodal transport has been done in Colombia, to ECOPETROL, moving and putting in place six bullets storage of LPG (liquid propane gas) with the following dimensions: 71 meters long, 9.1 meters in diameter and 580 tons each. In Venezuela, a transport structure for the bridge over the Orinoco River with a weight of 1028 tons. We transport approximately 90% of power transformers in the country for clients such as Siemens and ABB, to handle various sizes and weights.
We participate in projects that contribute to the development of the country, performing industrial assembly, such as installation of boilers for the project Termosierra, assembling of generators for the project Termocandelaria movement of oil drills, movement and assembly of turbines and generators Termopaipa, direct download ships, download generator sent through the air Antonov. ECOPETROL working on several projects of transport and lifting of loads.
At present we have been working on the development of the Project DRUMMOND, supplying cranes and equipment with different capabilities.


